From the supply, installation, and operation of charging infrastructure to the billing of internal and external charging processes: With the Swarco backend and the appropriate charging infrastructure, all requirements around electromobility can be mapped from a single source.
But what if at a location the power grid is not equipped for conventional fast charging technologies? Therefore, the High-Power Charger (HPC) with battery connection from Ads-Tec offers the solution. With the HPC-Booster, ordinary electricity from the grid is "boosted" into high-power electricity using an integrated buffer battery. This enables charging within minutes at one or two charging stations, which are positioned separately from the compact battery system. The result is a charging system with flexible connection options that allows every customer to set up a suitable charging infrastructure, no matter where.
Future-proof solution for company, staff and customer vehicles
With the HPC, Swarco offers companies a future-proof and efficient charging solution for company, staff and customer vehicles. The all-round service with 24/7 availability of the high charging performance, including call centre support for end customer or staff questions, is of course included. For this purpose, a network of certified sensor and charging pole suppliers as well as 250 highly qualified service technicians in Germany alone, are available.
See also: ADS-TEC and TEAG cooperate on ultra-fast EV charging
“Ads-Tec's HPC boosters are an ideal addition to our e-mobility portfolio. Now we can also offer our complete service to companies with power-limited grids “, says Marcus Anders, Managing Director of Swarco Traffic Systems GmbH.
Closing charging gaps where power is limited
Thomas Speidel, CEO of Ads-Tec and President of the German Association for Energy Storage Systems (BVES), is pleased that the strategic cooperation with Swarco will make the urgently needed fast-charging infrastructure available for the rapidly growing share of electric vehicles - even without time-consuming and expensive grid expansion at almost any location:
Also interesting: Lorry as mobile fast charging system for EVs
"With around 900 ultra-fast charging points, our systems already reliably deliver high charging power at many locations in the distribution grid, for example even in the middle of large cities. Swarco has a lot of experience in building and managing complex infrastructures in the area. It is an important step and a confirmation of our platform offerings that Swarco relies on the compact, high-performance and low-noise Ads-Tec technology to close the charging gaps even in power-limited locations." (mfo)